Kevin Forbus presented Five Star Bath Solutions’ exclusive Smart Choice package, highlighting the six-layer composite wall system with an embedded marble-style design, antimicrobial surface, and full waterproofing through reinforced backing. The representative emphasized that this system offered superior durability, low maintenance, and enhanced hygiene compared to fiberglass or acrylic, which can fade, flex, or harbor mold. Professional standards were reinforced by explaining that all installers are trained directly in Detroit, operate as full-time employees rather than subcontractors, and work under a $2 million liability insurance policy. The company’s nationwide presence added to the credibility of the solution.
The installation scope included complete demolition down to studs, new waterproofing, reinforced bracing, and plumbing upgrades. The space was finished with a new standard soaking tub, modern wall panels in a marble finish, and a sliding bypass glass door with matte black framing. Black-finished fixtures replaced the original chrome, and recessed shelving was added within the surround to improve storage. The design incorporated safety through a properly secured grab bar and a more accessible layout. Installation was planned over two days, including thorough demolition, reconstruction, and final cleanup.
Five Star Bath Solutions provides a fully transferable lifetime warranty covering product, labor, and materials through the Smart Choice package. The warranty is comprehensive and free of exclusions that competitors often apply. Financing flexibility, same-day corporate upgrade discounts, and promotional incentives for review participation or scheduling adaptability were also presented. The project estimate of $15,180 included all labor and materials, with approximately $1,300 in savings available for same-day agreement.
Features Presented by the Representative:
* Replacement of tub/shower combo with updated soaking tub
* Marble-style antimicrobial composite wall panels with seamless finish
* Waterproof reinforced backer system for durability and hygiene
* Matte black fixtures and sliding glass door with secure framing
* Recessed shelving for integrated storage
* Grab bar installation for added safety
* Full demolition, bracing, plumbing, and reconstruction to studs
* Two-day installation with complete cleanup and protection of home
* In-house, Detroit-trained installers (no subcontractors)
* Lifetime transferable warranty on product, labor, and materials
* Fixed-price estimate with financing and discount options available