The final design included a three-panel composite wall system in a neutral beige stone pattern. A matte black fixture package was selected in place of the originally stated chrome, providing modern contrast against the lighter walls. Instead of two corner shelves and one niche, the final install included a **recessed shelving unit with three vertical compartments**. A fold-down teak bench was added on the window wall. A matte black grab bar was mounted across the stationary glass door for support and access. The sliding glass enclosure featured black framing, diverging from the originally expected chrome or silver.
Tabitha Lambert, the Five Star Bath Solutions representative, guided the customer through the Smart Choice system, which features antimicrobial, scratch-resistant, and non-porous wall panels. She presented the six-layer composite construction and explained how the wall finish simulates natural stone while eliminating the upkeep of tile or grout. Tabitha also discussed the company’s patented waterproof backer board, designed to resist mold and protect the home’s structure. The quad-lock sealing and marine-grade silicone system eliminate caulk lines and ensure longevity without rework.
All work was completed by background-checked, in-house installers trained in Broussard. The installation involved demolition down to the studs, a moisture inspection, plumbing replacement, and application of the waterproof foundation. The quoted eight-week lead time for materials was upheld, and the project was completed within a three-day window. Job site cleanliness and customer walkthroughs were part of the closeout process.
Five Star Bath Solutions provides a lifetime warranty covering both materials and labor. The warranty includes all wall panels, plumbing, accessories, and structural components, fully transferable to future homeowners. The Smart Choice package selected included a composite wall system, grab bar, recessed storage, teak bench, and matte black fixtures. The project was quoted at $15,000 with 77% off installation fees. Financing options were discussed but deferred as the customer planned to pay in full at a later date. Tabitha assured that selections and pricing would remain locked in for future scheduling.
Features Presented by Tabitha Lambert:
* Walk-in shower conversion with matte black fixture finish
* Composite stone-style wall system with antimicrobial, grout-free surface
* Fold-down teak bench on rear wall
* Recessed three-compartment shelving unit
* Matte black grab bar mounted on stationary glass panel
* Sliding glass door system with black frame
* Marine-grade silicone and quad-lock seal system
* Patented waterproof backer board with mold resistance
* Full demolition to studs and plumbing upgrades included
* In-house installation crew with background checks
* Completed in three days after eight-week lead time
* Lifetime transferable warranty on materials and installation
* $15,000 total cost with 77% installation discount and deferred payment option