Kirk Brown introduced Five Star Bath Solutions as a Louisiana franchise supported by a national network operating since 1996. He explained that the company focused exclusively on wet areas, was licensed and insured, and maintained strong reviews. He highlighted their Smart Choice wall system as a grout-free, antimicrobial, hard PVC composite with Quad Lock corner sealing. Compared to tile that fails in humid climates, this material eliminated the risk of mold and leaks, making it ideal for long-term performance. Kirk reinforced the company's reputation for integrity and explained their promotions, including 77% off installation and discounts for reviews and referrals.
Installation included full demolition to the studs, replacement of damaged framing at no extra cost, and the use of waterproof DensShield backer, slip-resistant shower base, marine-grade sealant, and structural reinforcements behind wall panels to support accessories. The project manager returned post-consultation to remeasure and finalize selections before ordering. The job was scheduled within a four-to-six week window and completed in two days. All work areas were protected with runners and the team managed demolition cleanup and plumbing updates.
Five Star Bath Solutions backed the remodel with a fully transferable lifetime warranty covering product, plumbing, fixtures, installation, and labor. Unlike prorated alternatives, this coverage remained valid for life and transferable with resale. The warranty also included grab bars and shelves. Price assurance was guaranteed, with a refund of the difference plus $100 if a comparable lower offer was found. These guarantees, combined with durable materials and a safety-first design, assured the customer that the remodel met immediate functionality and future reliability needs.
Features presented by Kirk Brown:
* Shower remodel with demo to studs
* Smart Choice PVC composite wall system with Quad Lock technology
* Waterproof, antimicrobial, grout-free surfaces
* Low-threshold slip-resistant shower pan
* Two reinforced horizontal grab bars for support
* Handheld wand with adjustable cradle
* Two corner shelves placed for seated or standing access
* Brushed nickel Delta fixtures
* Light marble-pattern wall system with solid white base
* Bypass sliding glass door for sealed access
* Runners placed to protect flooring, debris hauled away
* Two-day installation timeline, four to six weeks scheduling
* Financing with zero down or one-third deposit option
* Lifetime warranty covering products, plumbing, installation, and workmanship, transferable with home sale
* Price assurance guarantee with $100 refund difference