Ted, the Five Star Bath Solutions representative, proposed a water-resistant remodeling package using full-height composite wall panels in a marble pattern. The material selected eliminates grout, preventing water infiltration and mold formation. Ted explained the use of PEX plumbing lines and a larger drain upgrade to improve flow and durability. A custom-built shower base with a non-slip nano surface was chosen to match the walls and improve safety. The original layout was expanded within framing limitations to create a more open stall area.
The original black-and-pink ceramic tile and cast-iron tub were removed and replaced with new marble-look composite walls and a matching low-threshold base. A chrome-framed bypass glass door was installed in place of the requested single glass partition, due to structural constraints or splash prevention. Fixtures included a chrome-finished handheld shower wand with fixed height, corner shelves for storage, and a recessed drain. Vinyl plank flooring replaced the older hex tile. Wall repair and surrounding trim were completed with basic white wainscoting.
Installation was completed over a two-day period, including demolition, mold remediation, plumbing upgrades, wall prep, and custom glass install. All labor was performed by employees under the regional franchise, with no subcontracting. The production manager handled final measurements and staging.
Five Star Bath Solutions included a transferable lifetime warranty covering the composite material, glass components, fixtures, and plumbing. The project qualified for installation discounts and a corporate upgrade for same-day commitment, supported by flexible financing options.
Features presented in final remodel:
* Tub-to-walk-in shower conversion
* Marble-style composite wall panels, sealed to ceiling
* Low-threshold, custom shower pan with non-slip nano surface
* Chrome handheld wand with adjustable spray
* Framed sliding glass door (bypass style)
* Chrome hardware and fixtures
* Corner shelves for product storage
* New larger drain system and PEX plumbing lines
* Remediated moisture issues behind previous tile
* Vinyl plank flooring
* Painted wainscoting and trim to finish edges
* Full haul-away of old fixtures and materials
* Two-day installation by in-house technicians
* Fully transferable lifetime warranty
* Financing options with promotional labor discount