Tom Seesz from Five Star Bath Solutions provided a full overview of the company’s proprietary composite panel system and solid shower bases, emphasizing their grout-free surface and ease of cleaning with simple solutions. He described the structure of their waterproof DensShield backer boards and quad-lock corner protection system. Delta commercial-grade fixtures and solid steel shelf mounts were included to support long-term stability. Tom also noted that all materials are custom-fit on-site to ensure seamless finishes without reliance on caulk or grout.
Installation included full removal of the jetted tub, wall tile, and plumbing. A 32x60 solid-core composite base with a right-hand drain was installed, featuring a 2 ¾-inch threshold for low-step entry. The Triton-pattern walls extend to the ceiling and were paired with two matching corner shelves. Grab bars in 36-inch and 24-inch sizes were mounted securely, and a brushed nickel handheld shower was installed on a valve with built-in temperature control. A straight curtain rod was chosen over a curved one to maximize space and accessibility.
Five Star Bath Solutions offers a fully transferable lifetime warranty covering all materials, labor, and fixtures. The warranty includes U.S.-manufactured parts with no time-based limitations on transfer. Pre-construction walkthroughs ensure clear planning for layout and access, and the remodel was scheduled for completion within six to eight weeks of contract approval. The company’s high customer satisfaction rating and no-pressure consultation model contributed to the homeowner’s overall confidence.
Features presented:
* Tub-to-walk-in shower conversion with Triton wall system
* 32x60 solid-core composite shower base with right-hand drain
* DensShield waterproof backer board with quad-lock corner system
* Delta commercial-grade valves and brushed nickel handheld shower
* Two corner shelves and two safety grab bars (36" and 24")
* Thermal expansion sealant (eliminates need for re-caulking)
* Full wall-to-ceiling coverage and matching window trim
* Straight curtain rod installed for easy access
* Full plumbing replacement from trap up
* Pre-construction walkthrough by project manager
* Fully transferable lifetime warranty on all components
* Install timeline of 6–8 weeks from approval